Export Schedule Files

You can export the schedule entries for both DB2 SP and IMS/DC workload to a mainframe data set.

To export schedule files

  1. Click Export in a populated DB2 or IMS Scheduling dialog.

    The Scheduling Export dialog opens.

  2. Type or select a fully qualified z/OS data set name from the Dataset Name drop-down list. This data set will be used as output of the export process.

    Note: Do not enclose the data set name in quotes.

  3. Select a data set type in the Dataset Type for Export field:
  4. Click OK.

    A confirmation message is displayed to confirm that Schedule export is completed.

For more information about exporting schedule files, see the CA InterTest Batch User Guide.


Copyright © 2016 CA. All rights reserved.